Contact Us to Reach Chinese Companies Searching for Business Park Space in the United States
首页 园区库主页 园区库列表 Kigali Special Economic Zone

Kigali Special Economic Zone

National
Area:2.8 k㎡
Information:400-618-9895
Zip code: -
Industries: Pharmacy,Plastics And Metals,Electronics/ IT,Chemical Engineering,Light Industry,Mechanical Engineering,Sales,Services,Logistics And Storage
Overview
Information
City
Companies
Third Party
Comments
  • Investment
  • Intro

Investment

Price of land:150.0 million US$/k㎡Subsidy on land: - million US$/k㎡
Environmental protection requirement:No Tax on land: - million US$/k㎡
Factory rental price range:12 ~ 20 US$/month•㎡Factory sale price range:350 ~ 450 US$/㎡
Office rental price range:30 ~ 45 US$/month•㎡Office sale price range:750 ~ 1100 US$/㎡

Intro

Kigali Special Economic Zone位于KG 220 St, Kigali, Rwanda。

园区主导产业为Pharmacy,Plastics And Metals,Electronics/ IT,Chemical Engineering,Light Industry,Mechanical Engineering,Sales,Services,Logistics And Storage。

整体占地2.8k㎡, It is serviced with roads, electricity, water and firefighting systems, sewage and fiber optic cables that will serve in easing the operations of investors. 等一应俱全。

同时,园区周边商业环境也正在飞速建设中,Business in Rwanda has been growing in the 21st century, and many new buildings have arisen across the city, including the BCDI Tower, Centenary House, Kigali City Tower and Kigali Convention Centre. Tourism provides important input into the economy.。

园区本地人口约为1.13 million persons、流动人口约为 - million persons, 区内教育资源丰富,拥有Adventist University of Central Africa,KIM University,每年毕业人数为:0.25 thousand persons。

除了园区生活配套设施丰富之外, 园区周边交通极其方便——0.13km to Kumwe Freight,No,No,4.2km to Kigali International Airport。

区内厂房出售价格350-450 US$/month•㎡起, 出租价格12-20 US$/㎡起。

写字楼出售价格750-1100 US$/month•㎡起, 出租价格30-45 US$/㎡起。

Kigali Special Economic Zone欢迎您的入驻,如想了解更多园区详细信息,可随时致电或留言。

Kigali Special Economic Zone期待与您共创辉煌!

Cost

Water:0.82 US$/m³Commercial electricity tariff:0.17 US$/kWh
Heavy industry electricity tariff:0.14 US$/kWhIndustrial electricity tariff (peak):0.18 US$/kWh
Industrial electricity tariff (off-peak):0.10 US$/kWhIndustrial electricty tariff (average):0.14 US$/kWh
Natural gas:4 US$/m³Water treatment: - US$/t.
Minimum wage:75 US$/monthOrdinary worker:285 US$/month
Land value tax: -

Facilities

Distance to freight station:0.13km to Kumwe FreightDistance to railway station:No
Distance to habor:NoDistance to airport:4.2km to Kigali International Airport
Introduction of district:The KSEZ Phase I is located at nearly 15km from the Kigali City Center and at 2km from the Kigali International Airport through the Kigali-Kayonza road. The KSEZ Phase II is located at 17km from the Kigali City Center and at 4km from the Kigali International Airport through the Kigali-Kayonza road.
Roads logistics:The construction of roads was the first element to be complemented by Prime Economic Zones (PEZ) in the development of both phases of the KSEZ.All the plots are well laid out and high-quality roads are also easily accessible for most trucks.
Railway logistics:There are currently no railways in Rwanda.
Residential housing price in this city:4550 US$/㎡
Support for residing in Park:It is serviced with roads, electricity, water and firefighting systems, sewage and fiber optic cables that will serve in easing the operations of investors.
Living environment:Kigali is a vibrant and musical city, with a wonderful nightlife and an intoxicating mix of cultural influences including Belgian and Middle Eastern. Many of its most alluring elements are natural – Mount Kigali can be summited in just half an hour and offers incredible views of the plains and mountains to the west.
Access to supermarkets:Peace Supermarket,One Stop Shopping Supermarket
Commerical enviornment:Business in Rwanda has been growing in the 21st century, and many new buildings have arisen across the city, including the BCDI Tower, Centenary House, Kigali City Tower and Kigali Convention Centre. Tourism provides important input into the economy.
Access to shopping malls:Iramiro House,Shopping Center
Access to hotels:Rouge by Desir,Kigali Marriott Hotel
Access to leisure and entertainment:Let's Go Tours Rwanda,Century Cinemas
Access to healthcare:Girimpuhwe Health Centre,Kicukiro Health Centre
Access to education:Adventist University of Central Africa,KIM University

Plan

The Kigali SEZ is developed in two phases:Phase I covers 98 hectares of land. It is serviced with roads, electricity, water and firefighting systems, sewage and fiber optic cables that will serve in easing the operations of investors.

Phase II has 178 hectares of land. The number of plots in that phase is 67 plots divided as follows: One plot sheltering a control room where all the electricity of the zone converges and is controlled; One plot sheltering water tanks supplying potable water to individual plots; One plot sheltering a sewage treatment plant that will treat all the sewage water from industries; 64 plots that will accommodate industries/warehouses including and one plot that will serve as an ICT PARK worth 61.30 ha.

The KSEZ has been designated and developed to accommodate different types of industries including; heavy and light manufacturing industries, large scale users industrial plants, industries requiring excellent national/international communication network, industries requiring close links with other firms (those firms which produce component parts for the same product or those involved in the separate stages of the same industrial process), wholesalers, chemical, pharmacy and plastics, warehousing, tourism and service industry and telecommunications among other services.

暂无政策数据
暂无产业分布数据
Kigali (Kinyarwanda: [kiɡɑɾí]) is the capital and largest city of Rwanda. It is near the nation's geographic centre. The city has been Rwanda's economic, cultural, and transport hub since it became capital at independence in 1962. The city hosts the main residence and offices of the President of Rwanda and government ministries. The city is within the province of Kigali City, which was enlarged in January 2006, as part of local government reorganisation in the country. Kigali's city limits cover the whole province; it is consolidated. The city's urban area covers about 70% of the municipal boundaries.
Bank
Talent
Legal
Accounting
Logistics
Environmental
Education
Healthcare

Introduction

The Kigali SEZ is developed in two phases:Phase I covers 98 hectares of land. It is serviced with roads, electricity, water and firefighting systems, sewage and fiber optic cables that will serve in easing the operations of investors.

Phase II has 178 hectares of land. The number of plots in that phase is 67 plots divided as follows: One plot sheltering a control room where all the electricity of the zone converges and is controlled; One plot sheltering water tanks supplying potable water to individual plots; One plot sheltering a sewage treatment plant that will treat all the sewage water from industries; 64 plots that will accommodate industries/warehouses including and one plot that will serve as an ICT PARK worth 61.30 ha.

The KSEZ has been designated and developed to accommodate different types of industries including; heavy and light manufacturing industries, large scale users industrial plants, industries requiring excellent national/international communication network, industries requiring close links with other firms (those firms which produce component parts for the same product or those involved in the separate stages of the same industrial process), wholesalers, chemical, pharmacy and plastics, warehousing, tourism and service industry and telecommunications among other services.

Comments

All Comments

  • Park Replied
No Comments
一键委托
免费委托 当日答复

地图

还可以输入150个字
感谢您的留言

3s后自动关闭